    (1)雨期施工中应有保证工程质量和安全施工的技术措施,并应注意收听、收看天气预报随时掌握气象变化情况;
    (1) should ensure project quality and safety in the construction period of the construction of technical measures, and should pay attention to listen and watch the weather forecast to grasp the change of weather;
    (2)雨期来临前上海管道疏通,应对施工场地原有排水系统进行检查加固,必要时应增加排水设施,保证水流畅通。
    (2) before the period of Shanghai pipeline dredge, deal with the construction site of the original drainage system to inspect reinforcement, when necessary to increase drainage facilities, to ensure smooth flow.
    (3)机械涉电部分要做好防水、防潮;仓库要加强检查,做好防漏、防潮工作。
    (3) mechanical electricity related part to do waterproof, moisture-proof warehouse; to strengthen inspection, good leakproof and moisture work.
    (4)雨期施工时,应保证现场运输道路畅通;
    (4) the construction period, should ensure a smooth traffic scene;
    (5)闭气土避免雨季施工,雨前应做成一定坡势,以利排除雨水;
    (5) the air soil to avoid the construction of the rainy season, water should be made of a certain slope potential, in order to eliminate the rain;
    (6)大雨、暴雨不能施工时上海松江区管道疏通,应对施工机械设备进行检修、保养,使之处于良好的状态,以便雨后施工的顺利进行。
    (6) heavy rain, heavy rain can not be built in Shanghai Songjiang District pipeline dredge, construction machinery and equipment to carry out maintenance, maintenance, so that it is in good condition, so that the smooth construction of the rain.
    (7)施工的影响:
    (7) the impact of construction:
    1)雨期进行清淤施工,应防止泥浆泵抽取区水位太高,最好保持在1m水深;
    1) period of dredging construction, should prevent water mud pumping area is too high, the best kept at 1m depth;
    2)对清淤过程中突然出现的暴雨,应将施工机械盖好塑料布,防止雨水进入电机。
    2) to a sudden rainstorm in the dredging process, construction machinery should be covered with plastic sheeting, prevent the rainwater from entering the motor.
    3)施工坚持“两及时”:即遇雨要及时检查,发现地面积水尽快排除,雨后及时检查,发现弃淤池淤泥流失要马上处理。
    3) construction, adhere to the "two time": the rain to timely inspection, found the ground water as soon as possible, the timely inspection, found abandoned silt pond silt erosion must be treated immediately.